DIN276 · CG 100

DIN 276 cost group 100 — site preparation

Deutsch

Brief definition

Cost group 100 (KG 100) under DIN 276 comprises preparatory site measures — work on the plot before the main construction works begin, insofar as assigned to this group.

Relevance for quantity take-off and BoQ

Quantities often derive from site plans and earthworks drawings (areas, volumes, lengths). Traceable geometry sources matter for bills of quantities and cost tracking.

AIGO relevance

AIGO supports calibrated quantity take-off from 2D PDFs — especially for geometry-driven groups. KG 100 is linked to the overall cost structure together with building construction groups.